Our factory is a manufacturing enterprise specialized in R&D, production, sales and installation of fast freezing equipments. We provide customers all over the world with reasonable design and best solutions with excellent and suitable production machines.
This freezer adopts an efficient freeing method. The low temperature cold air circulates in the enclosed air duct, so that the products on the belt are frozen in a full range from all direction.
Full stainless steel stucture esure safety and higiene for food with the features of high efficient, fast speed and uniform freezing.
It is widely used in freezing all kinds of fruits and vegetables, aquatic products, poultry, meat, pasta and all kinds of bags, tray and box conditioning food.
Model | CJW-500 | CJW-750 | CJW-1000 | CJW-1500 |
Capacity±10% (kg/h) | 500 | 750 | 1000 | 1500 |
Refrigeration amount (kw/h)(TO=-40ºC,TK=35ºC) | 115 | 140 | 185 | 256 |
Freezer size (m) | 8×3.3×1.6 | 10×3.7×1.6 | 13×3.7×1.6 | 16×4.3×1.6 |
Outside size (m) | 10.3×3.3×2.2 | 12.3×3.7×2.2 | 15.3×3.7×2.2 | 18.3×4.3×2.2 |
Power (kw) | 12 | 15 | 22 | 32 |
Feeding temperature | 20ºC | 20ºC | 20ºC | 20ºC |
Outfeeding temperature | -18ºC | -18ºC | -18ºC | -18ºC |
Inner circulation temperature | -35ºC±2 | -35ºC±2 | -35ºC±2 | -35ºC±2 |
Freezing time (min) | 10-60min | 10-60min | 10-60min | 10-60min |
Refrigerant | R717, R22 | R717, R22 | R717, R22 | R717, R22 |
Product show:
Installation site:
Application:
Customer installation case:
About Us:
Our factory is a manufacturing enterprise specialized in R&D, production, sales and installation of fast freezing equipments, processing machine for aquatic products, fruits & vegetable, ice making machine, etc. We provide customers all over the world with reasonable design and best solutions with excellent and suitable production machines.
Our Factory:
:
Our main market:
Payment:
We accept T/T, L/C,Or we can negotiate it.
Packing:
Iron framework with axternal plywood and seaworthy packing.
Delivery time:
According to the size: About 30-120 working days upon receiving the deposit.
For the urgent order, we will treat it urgent.
How to make order:
We will start to arrange the production upon receiving the confirmation of the contract as well as the project design drawing.
We make 30-50% advanced deposite after contract confirmation and 50-70% to be paid before shipment.
Shipment:
We will send the original documents or email for the goods.